
Appendices
2-1 EIAR Scoping Exercise Reponses
2-2 Strategic Infrastructure Development Determination Letter
2-4 Consideration of Replanting
4-2 Peat and Spoil Managaement Plan
4-3 Construction and Enviornmental Management Plan
4-4 Surface Water Management Plan
4-5 Glenora Wind Farm 110kV Grid Connection - Construction Methodology
4-6 Glenora South Wind Farm 110kV Grid Connection - Detailed Drawings
4-8 Glenora Wind Farm Recreation Report
5-1 Wind Farms & Health Literature Review - Chapman 2015
5-2 House Prices Study - CXC Scotland 2016
6-4 CONFIDENTIAL Potential Badger Sett Locations
6-5 CONFIDENTIAL Potential Otter Holt Location
6-6 Biodiversity Management and Enhancement Plan
7-1 Bird Impact Assessment Report - Malachy Walsh & Partners
8-1 Geotechnical and Peat Stability Assessment Report
9-1 Flood Risk Assessment Report
9-2 Drainage Design Calculations
9-3 Water Framework Directive Assessment Report
12-1 Construction Noise Report
13-2 Ceide Fields Viewpoint Wireline
14-1 Landscape and Visual Impact Assessment Methodology
14-2 Landscape Character Assessment
14-3 Photomontage (Viewpoint) Assessment